Contact Us

Contact Us

Contact Us2023-05-31T08:33:43+00:00

Let’s Have a Discussion About Our Groundbreaking Line Systems

Book a Discovery Call or Ask a Question:
Call Us:

If you’d like to speak to a member of our team, contact ApolloLAM any time between 8am and 4.30pm Monday to Friday.

+44 (0)1636 707 272
Email Us:

For general enquiries you can either email us directly at our email below, or you can fill out the form on this page. We aim to respond to each enquiry within 24 hours.

sales@apollolam.com
Visit or Mail Us:

For all visits and mail, please use the following address.

15c Telford Drive, Newark, NG24 2DX (UK).

Let’s Have a Discussion

Book a Discovery Call or Ask a Question:
Book a Discovery Call or Ask a Question:
Call Us:

If you’d like to speak to a member of our team, contact Apollo Engineering any time between 8am and 4.30pm Monday to Friday.

+44 (0)1636 707 272
Email Us:

For general enquiries you can either email us directly at our email below, or you can fill out the form on this page. We aim to respond to each enquiry within 24 hours.

sales@apolloengineering.co.uk
Visit or Mail Us:

For all visits and mail, please use the following address.

15c Telford Drive, Newark, NG24 2DX (UK).

Why Install Our Products?

Simple and Affordable

Apollo’s products are exceptional value for money, and are installed by our expert engineering team.

Completely Integrated Team

Designed, manufactured, installed, monitored by the same people, all of whom you will be in touch with.

Food Industry Experience

Apollo’s integrated design and engineering team have over 20 years’ of food sector experience.

Frequently Asked Questions

We’re often asked a lot of questions from food manufacturers about how the suite of Line Automation Monitoring products work. Here’s a selection of frequently asked questions. If you have another question, please get in touch with us using our contact form below.

Who benefits most from the line Energy Monitoring unit?2022-11-08T11:42:56+00:00

The line Energy Monitoring unit is suited for any manufacturing facility looking to analyse how much they are able to save in wasted utilities (electricity, air, and water) as part of their condition marketing processes.

Will the installation interfere with the production process?2023-05-31T08:21:50+00:00

Absolutely not. The installation of the Line Monitoring Unit simply plugs directly into the line and is done by a trained member of the ApolloLAM installation team. The installation time can vary depending on a customer or production line’s requirements, but in some cases can be installed in a little as 1 hour.

How much does it cost to install?2023-05-31T08:21:58+00:00

The installation of all Line Automation Monitoring units is covered in the cost of our services and is done by trained ApolloLAM installers, so it couldn’t be any simpler.

How long does the line energy audit last?2023-05-31T08:22:20+00:00

A food production utility wastage audit typically lasts for seven days. However, there may be times an ApolloLAM engineer recommends extending this for a variety of reasons; including production complexity, line size, or production schedule.

Go to Top